NFCC Drafting Project
| | This housing construction project is being subcontracted by the Glee family in Madison, Florida |

| | Site Preparation | |
| 
| | Digging the footings | |
| 
| | Placing rebar in the footings | |
| 
| | Pouring the concrete for the footings | |
|
| 
| | Placing the stemwall on top of the concrete footing | |
| 
| | Concrete being poured into the stemwall | |
| 
| | Dirt is placed inside the stemwall | |
| 
| | Compacting the dirt inside the stemwall | |
|
| 
| | Dirt being placed inside the stemwall | |
| 
| | Visqueen vapor barrier in place and ready for concrete | |
| 
| | Concrete slab being poured | |
| 
| | Finishing the concrete slab | |
|
| 
| | Framing the exterior once the concrete slab is dry | |
| 
| | Students observing and discussing the framing process | |
| | |
|
|